NORMAL
DEMO MODE
Simulated prototype data
Optimization Engine:
MOCK
Forecast Engine:
MOCK
Data Source:
SIMULATION
3-minute demo · step 1 of 8

Tomorrow's factory baseline

Boiler-led heat supply with a fixed heat-pump baseload. Evening demand breaches the 3.0 MW grid limit.

Baseline

Baseline schedule — grid limit exceeded 17:00–19:00

Grid limit