Tomorrow's factory baseline
Boiler-led heat supply with a fixed heat-pump baseload. Evening demand breaches the 3.0 MW grid limit.
Baseline
Baseline schedule — grid limit exceeded 17:00–19:00
Grid limit
Boiler-led heat supply with a fixed heat-pump baseload. Evening demand breaches the 3.0 MW grid limit.