NORMAL
DEMO MODE
Simulated prototype data
Optimization Engine:
MOCK
Forecast Engine:
MOCK
Data Source:
SIMULATION
Settings

Settings

Demo factory

Plant configuration

Prototype assumptions
Plant
Food Processing Plant A
Sector
Food processing
Operating hours
06:00–22:00
Grid connection limit
3.0 MW
Industrial heat pump
1.0 MWe · COP 2.8–4.0
Electric boiler
2.0 MWe · η 98%
Thermal energy storage
8 MWh thermal
Battery
2 MWh usable · 1 MW
Onsite solar PV
1.2 MWp
Typical daily process heat
≈ 20 MWh thermal
Data connections

Backend

Mode
Mock services (demo)
API base URL
not configured
SCADA / EMS
Future integration

Prepared for future storage of plants, assets, forecasts, optimization runs, decisions, scenarios, test runs, users and organizations.