Settings
Settings
Demo factory
Plant configuration
Prototype assumptions
- Plant
- Food Processing Plant A
- Sector
- Food processing
- Operating hours
- 06:00–22:00
- Grid connection limit
- 3.0 MW
- Industrial heat pump
- 1.0 MWe · COP 2.8–4.0
- Electric boiler
- 2.0 MWe · η 98%
- Thermal energy storage
- 8 MWh thermal
- Battery
- 2 MWh usable · 1 MW
- Onsite solar PV
- 1.2 MWp
- Typical daily process heat
- ≈ 20 MWh thermal
Data connections
Backend
- Mode
- Mock services (demo)
- API base URL
- not configured
- SCADA / EMS
- Future integration
Prepared for future storage of plants, assets, forecasts, optimization runs, decisions, scenarios, test runs, users and organizations.