NORMAL
DEMO MODE
Simulated prototype data
Optimization Engine:
MOCK
Forecast Engine:
MOCK
Data Source:
SIMULATION
Scenario Lab
Scenario Lab
Stress-test Energy LIFT under changing industrial conditions.
Simulated scenario results
01
Normal day
Normal production
Normal energy prices
Normal grid conditions
RUN SCENARIO
02
Electricity price spike
Price increases sharply between 17:00–20:00.
RUN SCENARIO
03
Grid constraint
Available grid import temporarily falls from 3.0 MW to 2.3 MW.
RUN SCENARIO
04
Production surge
Production demand increases by 18% between 16:00–20:00.
RUN SCENARIO
05
Solar underperformance
Actual solar output is 40% below forecast.
RUN SCENARIO
06
Heat pump unavailable
Heat pump becomes unavailable from 15:00–17:00.
RUN SCENARIO
07
Combined stress event
High production
+ high price
+ reduced grid capacity
RUN SCENARIO