Optimize
Optimize Tomorrow
Configure forecast inputs and the optimization objective. Hard constraints are enforced by the constraint layer and cannot be relaxed.
Deterministic mock optimizer · POST /api/optimize ready
Inputs
Forecasts & initial state
Production plan
Plan A · 06:00–22:00 · 100%
Heat demand forecast
20.4 MWh · model v0.3
Electricity price forecast
Day-ahead · avg €84/MWh
Solar forecast
5.2 MWh · NWP blend
Carbon intensity
Grid forecast · 180–350 g/kWh
Grid limit3 MW
Initial thermal storage4.8 MWh
Initial battery SOC54 %
Objective
Optimization objective
Mandatory
Hard constraints
- Production demand must be fulfilled
- Required thermal demand must be fulfilled
- Grid import ≤ 3.0 MW
- Thermal storage must remain within operating limits
- Battery SOC must remain within limits
- Equipment capacities cannot be exceeded
- Minimum process temperature must be respected
These hard constraints are mandatory. Any schedule that violates them is rejected before it reaches operators.